Files
Infinity_Vis_Rust/docs/acceptance_template.md

38 lines
858 B
Markdown

# Acceptance Template
Date:
Technician:
Firmware build:
Host build:
## Core Checks
- [ ] System starts from cold boot
- [ ] All 6 nodes discovered
- [ ] All 18 outputs configured
- [ ] All outputs confirm 106 LEDs
- [ ] Global brightness change is visible immediately
- [ ] Blackout works and recovers cleanly
- [ ] Preset recall works under load
- [ ] Node reconnect works during active show
- [ ] 8-hour soak run completed without critical fault
## Mapping Checks
- [ ] Walking pixel test completed on every output
- [ ] Start pixel confirmed for every output
- [ ] Direction confirmed for every output
- [ ] Color order confirmed for every output
- [ ] Top, middle, bottom assignment confirmed on every node
- [ ] No mismatch between configured mapping and observed physical behavior
## Observations
- Notes:
- Exceptions:
- Follow-up actions: