Files
Infinity_Vis_Rust/docs/acceptance_template.md

858 B

Acceptance Template

Date:

Technician:

Firmware build:

Host build:

Core Checks

  • System starts from cold boot
  • All 6 nodes discovered
  • All 18 outputs configured
  • All outputs confirm 106 LEDs
  • Global brightness change is visible immediately
  • Blackout works and recovers cleanly
  • Preset recall works under load
  • Node reconnect works during active show
  • 8-hour soak run completed without critical fault

Mapping Checks

  • Walking pixel test completed on every output
  • Start pixel confirmed for every output
  • Direction confirmed for every output
  • Color order confirmed for every output
  • Top, middle, bottom assignment confirmed on every node
  • No mismatch between configured mapping and observed physical behavior

Observations

  • Notes:
  • Exceptions:
  • Follow-up actions: