# Validation Open Points
|
||||
|
||||
These items must be resolved before the system can move from structural validation to activation validation:
|
||||
|
||||
1. Confirm the real meaning of `UART 6`, `UART 5`, and `UART 4`.
|
||||
2. Confirm the exact LED chipset and required output timing backend.
|
||||
3. Confirm whether every output truly has exactly 106 active LEDs, with no dummy or reserve pixels.
|
||||
4. Confirm color order for each output.
|
||||
5. Confirm direction and start pixel for each output.
|
||||
6. Confirm which physical node controls which installed top, middle, and bottom panel.
|
||||
7. Confirm whether transport runs over dedicated Wi-Fi or wired Ethernet.
|
||||
8. Confirm whether DDP compatibility is optional or mandatory in the first deployment.
|
||||
9. Confirm whether the first production UI is Tauri, egui, or another adapter on top of the host core.
|
||||
|
||||