Initial commit

This commit is contained in:
2026-04-17 01:33:23 +02:00
commit 1f6543bd7a
28 changed files with 2556 additions and 0 deletions

View File

@@ -0,0 +1,14 @@
# Validation Open Points
These items must be resolved before the system can move from structural validation to activation validation:
1. Confirm the real meaning of `UART 6`, `UART 5`, and `UART 4`.
2. Confirm the exact LED chipset and required output timing backend.
3. Confirm whether every output truly has exactly 106 active LEDs, with no dummy or reserve pixels.
4. Confirm color order for each output.
5. Confirm direction and start pixel for each output.
6. Confirm which physical node controls which installed top, middle, and bottom panel.
7. Confirm whether transport runs over dedicated Wi-Fi or wired Ethernet.
8. Confirm whether DDP compatibility is optional or mandatory in the first deployment.
9. Confirm whether the first production UI is Tauri, egui, or another adapter on top of the host core.